Road closure
Work to stabilise mountainside on blocked Ronda-San Pedro road progresses well with new viaduct now under construction
Chus Heredia | Ronda
All the blasting, shoring up and heavy machinery used to stabilise the landslide-hit terrain have enabled engineers to start assembling the damaged bridge above Benahavís